Savings Calculator
Cooling tower + RECOVER savings model
Start with your cooling tower size to model water savings and OpEx reduction. Refine water chemistry, cost, and operating assumptions only when you know them, then carry the estimate into a technical site review.
Site recovery assessment
Turn the model into a site-specific review.
Share the project stage and what you know today. Nona's technical team will review the assumptions, identify missing inputs, and recommend the next engineering step.
A screening review is not a final design. Actual results depend on cooling load, water chemistry, operating duty, climate, and local rates.